Practical tool

Restoration quote comparer

Put two entered proposals on the same arithmetic basis, with scope differences and unknowns kept beside the totals.

HAUSE editorial guide Updated October 11, 2026

Compare the same rooms and work.

Use the actual currency and entered tax assumptions.

A calculated difference does not rank the providers.

Compare like with like
ScopeRooms, quantities and exclusions
AmountsBase, extras and assumptions
QuestionsUnpriced or unresolved items

The lowest entered total is not a quality or coverage decision.

Begin with matching scope

Before comparing totals, identify whether both proposals cover the same rooms, materials, quantities and outcome. Check contents handling, storage, waste disposal, assessments, drying documentation, repair finishes and taxes. If a line is missing, write a question; do not assume it is included or enter an unknown as zero.

This tool performs arithmetic on your amounts. It does not assess workmanship, verify a contractor, interpret insurance or recommend the lower total.

Understand the calculation

For each proposal, the tool adds your base amount and other entered charges, then applies your chosen contingency and tax percentages to that sum. Tax is applied to the entire scenario, including the contingency allowance. Use that approach only if it matches the comparison you intend; confirm actual tax treatment separately.

(base + other charges) × (1 + contingency ÷ 100) × (1 + tax ÷ 100)

Compare your entered proposals

Resolve the differences before choosing

DifferenceQuestion to send back
One proposal includes storageFor how many items, where, for how long and at what ongoing charge?
An allowance replaces a fixed amountWhat is assumed, and how will the final amount be agreed?
A repair area is excludedWho will assess and price it, and does it affect the rest of the work?
Completion records are unspecifiedWhich reports, inspections, warranties and outstanding-item records will be supplied?

Use one scope revision for the final comparison. Keep the earlier versions so you can explain how the agreed work and total changed.

Keep the final decision broader than the total

Review qualifications relevant to the scope, the written contract, payment milestones, exclusions and the method for approving changes. Ask the insurer about its own requirements where a claim is involved. Read the estimate disagreement guide if two parties are pricing different work, or use the scope register guide to organize the missing information.

Sources and further reading

Reviewed October 11, 2026. Follow the source’s current guidance and the instructions for the actual property.