Run a property plan and an operating plan together
Restoring the premises is only one part of a business interruption. The operator also needs a plan for people, records, customers, suppliers and essential services. Assign a lead for the building work and a lead for business continuity, even if one person initially holds both roles. Keep the two plans connected at a short, regular review.
Do not publish a reopening date until you know the conditions it depends on. A room can be cosmetically complete while a system, inspection, supplier delivery or operating permission remains unresolved.
Agree who controls the affected property
| Party | Clarify the responsibility |
|---|---|
| Owner or landlord | Building access, base-building work and lease-related decisions. |
| Tenant or operator | Business property, operating needs and authorized representatives. |
| Property manager | Shared areas, contractors, notices and site coordination. |
| Insurer or adjuster | Applicable policy, evidence, expenses and claim approvals. |
| Contractor and specialists | Assessed scope, work method, qualifications and records. |
| Relevant authorities | Required permits, inspections and permission for the actual use. |
Write the allocation down. A lease, service contract or insurance policy can affect who pays for or authorizes an item, so confirm the applicable documents rather than assuming the landlord or insurer handles everything.
Define the work by asset and operating need
Create separate registers for the building, systems, machinery, stock, furniture, documents and customer property. For each, identify the condition, assessor, proposed action and replacement or cleaning decision. Record serial or asset numbers where useful and maintain the link between an item and its storage location.
- Which area or asset must be available for a limited operation?
- Can it be separated from the work zone and used with the required approvals?
- Which equipment needs specialist inspection or recommissioning?
- Which items belong to customers, staff or a third party?
- Which records must be preserved for the insurer or business obligations?
Give the insurer a usable interruption record
Ask the insurer or broker what the policy requires for business interruption, extra expense, stock, equipment and property owned by others. These are different coverage questions. Keep the records requested, including actual operating impacts and the basis of each expense, through your normal secure business systems.
IBC describes several business coverage categories. Use its overview to frame questions, not to assume a particular policy responds or that an expense will be reimbursed.
Build a reopening decision list
| Decision | Evidence or confirmation to arrange |
|---|---|
| Building and access | Required inspections, current restrictions and safe access arrangements. |
| Systems and equipment | Relevant trade or specialist review and operating instructions. |
| Workplace arrangements | Staff access, work-zone boundaries and task-specific procedures. |
| Public use | Applicable fire, building, health or other operating approvals. |
| Stock and customer property | Documented disposition, replacement or return decisions. |
| Communications | A confirmed operating scope and contact for future changes. |
For specialist premises, involve the appropriate regulator or professional early. Food premises, health-related businesses and industrial operations should not use an ordinary office checklist as a complete reopening plan.
Choose the right next guide
Continue with office recovery, retail recovery or restaurant recovery for the assets and decisions specific to those settings. Use the business questions worksheet to prepare a discussion without sending anything until you choose to submit an enquiry.
Sources and further reading
- Insurance Bureau of Canada · business coverage
- Insurance Bureau of Canada · making a claim
- IICRC · S700 fire and smoke restoration scope
Reviewed October 11, 2026. Follow the source’s current guidance and the instructions for the actual property.