The written scope should explain where these workstreams overlap.
Start with the damage, not a package name
A fire recovery scope should describe the property that was actually assessed. “Full restoration” is not a useful substitute for the rooms, building systems, contents and hidden spaces included in the work. The important question is whether each affected item has an identified treatment and a way to judge the result.
Use four workstreams to organize a discussion: the building, smoke residues, water and contents. They overlap. For example, a ceiling can be smoke affected on its face, wet above it and require a structural review at its supports. One cleaning line item cannot resolve all three.
Know what each workstream needs
| Workstream | Questions the scope should answer | Evidence to request |
|---|---|---|
| Building and structure | What can remain, what must be exposed, and who decides? | Assessment, marked plans and repair details where needed. |
| Smoke and soot | Which surfaces, cavities, systems and contents are affected? | Assessment boundaries, cleaning method and outcome checks. |
| Water and drying | Where did water travel and which materials remain wet? | Material-specific readings, drying targets and progress records. |
| Contents | What is removed, cleaned, stored, returned or replaced? | Item identifiers, photographs, inventory and disposal approval. |
The IICRC S700 public scope covers fire residues and odours in structures, systems and contents. Reconstruction and wildfire situations require additional consideration beyond that standard’s scope.
A realistic sequence has decision points
- Access and stabilization: the responsible parties establish entry restrictions and the work needed to prevent further loss.
- Assessment: specialists identify affected areas, material conditions and questions that remain concealed or untested.
- Written scope: the proposed treatment, exclusions, prices and approval responsibilities are agreed.
- Cleaning, removal and drying: work proceeds within the assessed and authorized boundaries; discoveries are recorded as changes.
- Repair and reinstatement: required designs, permits, trade work and inspections are coordinated before finishes hide the work.
- Completion review: outstanding defects, records, warranties and any use restrictions are resolved or clearly assigned.
Several workstreams may proceed together, but a calendar alone cannot determine that the next stage is ready. Ask the project manager to identify dependencies: for example, the evidence required before a wall cavity is closed.
Know who is deciding what
The insurer handles policy and claim decisions; the contractor proposes and carries out contracted work; qualified assessors address their own technical scope; the relevant authority handles its approvals. A project coordinator can keep these conversations moving but should not silently stand in for every decision maker.
| Decision | Record it this way |
|---|---|
| Temporary access | Who allowed it, the date, areas covered and restrictions. |
| Work authorization | Scope revision, person approving, amount or limit, and exclusions. |
| A changed repair detail | Reason for change, designer or trade responsible, and approval needed. |
| Ready for use | The relevant inspection or professional advice, remaining conditions and responsible party. |
Compare proposals on equal scope
Two totals are comparable only when you know what they include. Check quantities, containment, contents handling, storage duration, waste disposal, drying records, specialist assessments, repair finishes and taxes. Make a separate list of allowances and provisional items; they can change as concealed areas are opened.
Avoid forcing an unknown into a zero-dollar line. Instead, identify who will resolve it and when the price will be agreed. The quote comparer totals your entered amounts and keeps scope notes beside them; it does not rank contractors.
Use a completion file, not just a final invoice
- The agreed scope and every approved change.
- Assessment and inspection records that apply to the work.
- Drying or cleaning documentation and any specialist reports.
- A contents reconciliation: returned, stored, replaced and disposed items.
- Product and workmanship warranty information, care instructions and contact details.
- A dated list of remaining items, owners and follow-up arrangements.
Walk through the written scope while reviewing the finished work. Photograph questions and tie each one to a room or line item. For rebuilding decisions, continue with the rebuilding guide.
Sources and further reading
- IICRC · S700 fire and smoke restoration scope
- IICRC · S500 water damage restoration scope
- IICRC · S590 HVAC assessment scope
- Insurance Bureau of Canada · making a claim
Reviewed October 11, 2026. Follow the source’s current guidance and the instructions for the actual property.